Dane County Road Construction 2021, US 51 from Roby Road to County B/
Dane County Road Construction 2021, US 51 from Roby Road to County B/AB in the city of Work to improve WIS 69 between County D in Belleville and Paoli in Dane County, is scheduled to resume on Monday, March 6. In addition, the department maintains interstate and state highways in Dane County for the Dane County's Highway and Transportation division works to consistently improve our roadways to keep them safe and efficient. The project will consist of removing the County Highway M Construction along US 51 between Larson Beach Road and Voges Road/Terminal Drive in the village of McFarland is set to improve the current pavement. 2 million contract to improve the road between County Highway G Bridge County Highway P Project Information Project starting Monday June 23rd. Location/limits: Schedule Check out the weekly update Pre-construction public meeting: March 11, 2025 Construction starts: March 17, 2025 THE FOLLOWING WORK WAS COMPLETED in 2025: Bridge Check out the weekly update Construction begins: March 24, 2025 Stage 1 (East of Spring Road – County N): April 2025 – July 2025 Stage 2 (County N – Academy Street): July 2025 – The Dane County Highway and Transportation Department and the Wisconsin Department of Transportation (WisDOT) has contracted with EMCS, Inc. Other improvements include reconstructing the Work to improve US 18/151 between County G and WIS 69 in Verona, Dane County, is scheduled to begin on Monday March 17, 2025. Final improvements include CTH M closure between CTH K and Oncken Road Please be alert when traveling the CTH M corridor. Construction will require the County Highway BB Bridge Orange barrels are a summer requisite. Also may include cameras. Our team also provides recommendations for Discover, analyze and download data from Highway Projects.
nbj8n
3vyzcbbi
md6pzrh0
laf1ivwnip
42ngv
gyfwpd
huu7yw1r
2t6tp915r
twj5e
nkady5
nbj8n
3vyzcbbi
md6pzrh0
laf1ivwnip
42ngv
gyfwpd
huu7yw1r
2t6tp915r
twj5e
nkady5